29 Oct 2015 – 2018 BioPark Project
Asset Survey and Building Services Consultancy for BioPark Medical Laboratory.
Codub was the sole contractor responsible for carrying out a comprehensive building and asset survey for BioPark Life Sciences, a Research and Development Centre. BioPark offers a range of ready-to-use chemistry and biology laboratories with a suite equipped to containment level 3 (CL3). The portfolio size was 51,844 square metres.
We surveyed all the properties on site and all the engineers used industry approved Motorola held PDAs to do the asset collection, which eliminated the need for paperwork and all the associated errors and time delays. Because the PDA packs the power of a cell phone, two-way radio, bar code scanner, digital camera and mobile computer, we were able to capture pictures of each asset.
As part of the contract, all the assets were bar-coded and we configured the screens specifically for BioPark to allow the ability to collect relevant information about any type of asset, which included the medical assets as BioPark provides specialist facilities and support for bioscience and health technology businesses. We were also involved in migrating the final data into Concept CAFM system for Reactive and Planned Maintenance.
Our building services design team carried out a measured survey to produce a CAD floor plan of the various plantrooms as well as the CL3 lab. We also provided installation survey and preparation of original schematic information. This entailed:
- Installation Survey and preparation of Original Schematic Information. Visit site to understand ‘As Is’ installation
- AHU plant and ductwork
- Associated electrical services, controls and interlock systems
- Compressed air services support
- Room equipment, sensors and Fire alarm
- Produce Schematic Drawings with various points like dampers, AHU, fans etc.
For more information on how we can be of help, please contact us on sales@codubconsulting.com